Apparently Gulf States Toyota doesn't get the same tracking information that SE Toyota gets, according to my salesman (like the nice little tracking bar showing build-->vessel-->port-->rail-->freight-->dealer that has been posted high above), but all dealers can send you the "guest.dealer.toyota..." link to the realtime spreadsheet. Then with the web page hacks mentioned above in this thread you can get ETA, status, etc.
With all this effort, I'm able to figure out that my Tahara R5004060 LC Trim was built after the hold (6/13), is on a ship that departed 6/21, with stateside arrival of 7/4/24 and ETA of 7/24/24.
Oh, the lengths we'll go to for a little information!!
I cancelled my Hino RK005297 (4/16 build) similar spec, because it arrived 5/12 in Portland and 6 weeks later, is still stuck in QC hold purgatory with no end in site.
In the end, I'm glad to have one coming that was built in Tahara and crazy to think that even though it was built two months later it may arrive before the other.